Welcome Guest   Main Menu General Home About Us Contact Us Registration Book Ticket Login Plan my Travel
Hill Charter
Darjeeling Himalayan Railway
Read more
 
New Jalpaiguri-Darjeeling - The toy train on the Darjeeling Himalayan section is not merely a source of delight for the young and old, it also represents the engineering skills of the highest order. This 83 km. long section connecting Darjeeling with the railhead at Siliguri is of great importance and has been bestowed World Heritage Site status.

Special packages available. Please click on "read more" to explore    
Kalka-Shimla Himalayan Railway
Read more
 
The Kalka Shimla Railway line is one of the most popular hill railway in India. The trains running on these tracks, are popularly called 'Toy Trains'. A journey on this railway is a unique experience as one passes through the breathtaking landscape of the majestic Himalayas, through tunnels and over bridges; amid the lush green valleys embellished with pine and oak trees. The traveller is left with a long lasting memory of rhapsody and triumph.    
Nilgiri Mountain Railway
Read more
 
The Nilgiri Mountain Railway is a 46 Km long and runs on 1000 mm gauge railway. It connects Mettupalayam to Ooty. The first section of the Nilgiri Railway up to Coonoor was completed in 1899 by the Nilgiri Railway Company and was extended to Ooty in 1903.    
Neral-Matheran Hill Railway
Read more
 
Matheran is situated on a hilltop at an altitude of 800 m. In shady trees, and unpolluted air the journey to this hilltop could be through an exciting two hour ascent in a toy train, with food and drink vendors and monkeys jumping on and off, or through a tough 11 km. road hike passing from dense forests. Matheran's cliffs with incredibly heights create stunning points.    
Pathankot – Jogindernagar Railway
Read more
 
Kangra Toy Train, where the passengers spend most of the time going through tunnels, the Kangra toy train- linking Pathankot and Joginder Nagar gently meanders through a maze of hills and valleys, offering the travellers enchantingly scenic views. The work on this line started in 1926. Three years later this, 163 km long route was opened to traffic.    
Press Room Privacy Policy Contact Us Disclaimer Others
Note: Best viewed in IE 5.5 and above with java script enabled, screen resolution set to 1024X768
Copyright © 2007 IRCTC - All Rights Reserved